18in Wood Cutting Bandsaw,Wood Working Band Saw WBS-18

Get 2% OFF discount for your first order. Code: NEWCUST

  • Customer Service

  • (909) 443-7923

  • info@kakaindustrial.com

  • Contact Us

KAKA INDUSTRIAL LLC  |  SKU: 271007V220

18in Wood Cutting Bandsaw,Wood Working Band Saw WBS-18

$2,178.00
Shipping calculated at checkout.

KAKA INDUSTRIAL WBS-18 18-Inch Wood Cutting Bandsaw

  • Powerful Performance: The KAKA INDUSTRIAL WBS-18 is built to handle the toughest cutting tasks with ease. Equipped with a robust 3HP motor, this bandsaw delivers unmatched power and precision, making it perfect for both professional woodworkers and DIY enthusiasts. Whether you're cutting through hardwood, softwood, or even metal, this bandsaw ensures smooth and efficient performance every time.
  • Versatile Cutting: With a 12-inch cutting height and dual-speed options (1509/3215 ft/min), the WBS-18 offers incredible flexibility. Switch between speeds to match the material you’re working with, from delicate wood projects to heavy-duty metal cutting. Its versatility makes it a must-have tool for any workshop.
  • Precision Bevel Cuts: The tilting table (10° left/45° right) allows you to make precise and flexible bevel cuts with ease. Whether you're crafting intricate designs or working on large-scale projects, this feature ensures accuracy and consistency in every cut.
  • Clean Workspace: The 4-inch dust port keeps your workspace clean and safe by efficiently collecting dust and debris. Say goodbye to messy work areas and focus on what really matters—bringing your creative ideas to life.
  • Durable Construction: Built with a heavy-duty steel frame, the WBS-18 is designed to last. Its sturdy construction ensures stability and durability, even during the most demanding tasks. This bandsaw is not just a tool—it’s an investment in quality and reliability.

    • Runs on 2.2kW/3HP powerful motor
    • Hinged blade guide with sight window
    • Quick-release blade tension
    • Tilt table for angle cutting

    1. Powerful Performance: Equipped with a robust 3HP motor, this bandsaw delivers unmatched power for heavy-duty cutting tasks.
    2. Versatile Cutting: Features a 12-inch cutting height and dual-speed options (1509/3215 ft/min) for precise cutting of various materials.
    3. Precision Bevel Cuts: The tilting table (10° left/45° right) allows for accurate and flexible bevel cuts.
    4. Clean Workspace: Includes a 4-inch dust port for efficient dust collection, maintaining a clean and safe work environment.
    5. Durable Construction: Built with a heavy-duty steel frame, ensuring stability and long-lasting durability.

    Item No.
    271007V220
    Model
    WBS-18
    Cutting capacity (Height)
     12"
    Cutting capacity (Width)
    18.3"
    Blade
    Width: 0.23"-1.25", Length: 145"
    Table (Size)
    16"x21.5" 
    Table (Left tilt)
    10°
    Table (Right tilt)
    45°
    Table (Height to floor)
    37.7"    
    Table (Groove “T” slot)
    (2) 0.39"x0.74"
    Motor(Amps)
    11A
    Motor(Horsepower)
    2.2kW/3HP
    Motor(Volts)
    220V
    Motor(Speed capacity)
    2   
    Motor(Speed range)
    1509/3215 ft/min
    Overall: Height ×Width × Depth
    76"×38"×28"
    Packing Size
    82"×23"×51"
    N.W./G.W.
    388/ 498 lbs

    • Tilt Work Table

      Tilt table with 10° left tilt and 45° right tilt for easy bevel cutting
      16x21.5-inch work table with large workspace for your materials

    • Dual 4" Dust Ports

      Two 4" dust ports collection ports provide maximum dust collection and connect to the dust collection system for a cleaner work environment

    • Cast Iron Wheels

      Cast iron wheels ensure smooth, quiet , vibration free operation

    Similar Products

    A table comparing the facets of 4 products
    Facet
    Title
    Title18in Wood Cutting Bandsaw,Wood Working Band Saw WBS-18Multifunctional woodworking machine(Planer+Thicknesser+Cutter+Drill)220V-60HZ-1PH WM-302010“Table Saw With Riving Knife & Extension Table for Woodworking and Cabinet Making 220V-60HZ-3PH WTS-1050KAKA INDUSTRIAL BTM-500 20" Heavy-Duty Disc Sander V220-60HZ
    Price
    Price
    $2,178.00
    $1,499.99
    $2,735.00 $3,039.99
    $2,299.00